Major Performance Record
For
The 4th quarter of 2011
| NR |
VESSEL |
COUNTRY |
WORK SCOPES |
PORT |
| 1 |
42,447GT
VEHICLES
CARRIER |
SINGAPORE |
1.Inspection and general checking on board for AVR of
Nr.2 aux' engine, with readjustment of AVR unit and single/ parallel running test.
2.Supply of RG214 cable for satellite antenna.
|
Incheon |
| 2 |
81,569GT
BULK CARRIER |
GREECE |
Air dryer(Kyungnam, 60N m3/h)
1.Replacement of compressor by ship's spare.
2.Re-starting of the unit and final adjustment. |
Dangjin |
| 3 |
69,132GT
CONTAINER SHIP
|
GERMANY |
Annual service for followings.
1.Local Fire fighting system
2.Fixed CO2 fire fighting system
|
Busan
|
| 4 |
69,132GT
CONTAINER SHIP
|
1.Voyage repair to renew pinion gear (1 set) and gear rack(37.6mtrs) for monorail of provision crane during
ship's voyage between Busan-HK-Ningbo.
2.Rewinding of an elec. motor for aux' blower of M/E
(AC 440V, 60HZ, 2 poles, 150KW, 3564RPM), as well
as the repair by metal spray, processing and polishing
for bearing housing, rotor shaft, grease cover and
bracket shaft hole. |
| 5 |
69,132GT
CONTAINER SHIP
|
Repair of crack on the blow-down pipe of aux' boiler, together with plugging & de-plugging by divers. |
| 6 |
69,132GT
CONTAINER SHIP
|
Inspection and checking for followings.
1.Cargo hold smoke detection system
2.Fire detection system. |
| 7 |
4,885GT
GENERAL CARGO
|
CHINA |
Fabrication/supply of bolts (SCM4) and nuts (Bronze)
for windlass brake belt.
|
Sam- chonpo |
| 8 |
36,999GT
BULK CARRIER |
GREECE |
1.Annual service for followings.
1)Fixed CO2 fire fighting system
2)Life raft(1x 6 persons, 2 x 25 persons)
3)Fire extinguishers
4)EEBD
5)SCBA
2. Supply of air reducing valve - 2 pcs
|
Sam- chonpo |
|
| |
Major Performance Record
For
The 3rd quarter of 2011
| NR |
VESSEL |
COUNTRY |
WORK SCOPES |
PORT |
| 1 |
24,025GT
MPC |
CYPRUS |
Elec. motor (HATLAPA, 440V, 17/51/51KW) for mooring winch.
1.Reconditioning of rotor shaft by metal spray,
processing and polishing, a
s well
as brake friction
pads by high pressure
treatment and surface
processing.
2.Rewinding of stator coil(AIW coil)
3.Dynamic balancing test |
Busan &
Masan |
| 2 |
20,471GT
GENERAL
CARGO |
ETHIOPIA |
Slip ring unit for ship's Nr.2 & 3 twin
crane (Macgregor).
1.New fabrication of slip ring by bronze
casting(7 pcs).
2.Fabrication/renewal of followings.
1)Power brush(7 pcs)
2)Insulation tube(18 pcs)
3)Power cable (7 pcs)
4)Terminal block(7 pcs)
5)Insulation tube for power brush(2 pcs)
6)Support tube(3 pcs).
3.Replacement of new slip ring unit
complete on board
with operation test. |
Pohang |
| 3 |
36,999GT
BULK
CARRIER |
GREECE |
Conversion of boiler drum DPT and boiler
feed water controller into electronic type
from pneumatic type, with installation of
followings, for water level control system
(Yamatake Honeywell) of an Osaka boiler.
1.Electronic DPT(ABB, 2600T)
2.Power supply(Suntronix, 110-24/3A)
3.Electronic control box(Hanyeong, NX-9)
4.Air source regulator(SMC, IW215-02BG)
5.I/P convertor(Power Genex, IPC-21) |
Ulsan |
| 4 |
18,000GT
GENERAL
CARGO |
GREECE |
Fabrication and supply of brake bands,
brake linings and friction bands etc., for
mooring winch. |
Busan |
| 5 |
36,803GT
BULK
CARRIER |
CHINA |
1.Annual service for life boat davit &
release gear
(PORT/STBD)
2.Annual service for life boat davit &
winch
(PORT/STBD)
3.SR survey including EPIRB and AIS. |
Samchonpo |
| 6 |
69,132GT
CONTAINER
SHIP |
GERMANY |
Annual service for followings.
1.Life rafts(5 sets)
2.CO2 air bottles(410 bottles)
3.Water mist plant/sprinkler system
4.BA air cylinder |
Busan |
| 7 |
69,132GT
CONTAINER
SHIP |
Rental of life saving equipments.
1.Life jackets
2.Immersion suits
3.Life rafts |
| 8 |
54,309GT
CONTAINER
SHIP |
GREECE |
Underwater inspection for crack in bow
thruster tunnel. |
Busan |
| 9 |
5,201GT
CHEMICAL
TANKER |
SINGAPORE |
Fire alarm system
1.General inspection on the system.
2.Modification of the system by fitting of
one(1)
additional manual call point on
emergency generator
room.
3.Function test. |
Ulsan |
| 10 |
26,580GT
GENERAL
CARGO |
U.S.A. |
Supply of stores. |
Donghae |
| 11 |
27,986GT
CEMENT
CARRIER |
Supply of stores. |
|
| |
Major Performance Record
For
The 2nd quarter of 2011
| NR |
VESSEL |
COUNTRY |
WORK SCOPES |
PORT |
| 1 |
32,957 GT
BULK CARRIER |
U. K. |
1.Nr. 2 top side tank (Port)
1)Repair on a crack with welding and
reinforcement
with 2 brackets by class
coded welders at an
anchorage, in the
presence of BV surveyor.
2)Non destructive test.
2.Nr. 3 Diesel Generator
1)Inspection and rectification for MSBD,
control
panel and ACB.
(Maker: Merlin Gerlin, Type: Masterpact NW12N1)
2)Simulation test for ACB. |
Busan
|
| 2 |
11,733 GT
Oil/Chemical
Carrier |
SINGAPORE |
Calibration for 7 kinds of gas detectors on
board,
including renewal of O2 sensor. |
Ulsan |
| 3 |
36,999 GT
BULK
CARRIER |
GREECE
|
Inspection for water level control system
(Yamatake Honeywell) of boiler (Osaka boiler). |
Ulsan |
| 4 |
26,078 GT
BULK CARRIER |
HONG- KONG |
Underwater hull cleaning for flat bottom, rudder
and
propeller, with underwater photographs. |
Incheon |
| 5 |
28,693 GT
BULK CARRIER |
U. K.
|
1.Air cooler for M/E(MAN B&W 6S 50MC)
Replacement of air cooler with ship's new
spare,
after some modifications for proper
mounting on spot.
2.Elec. motor(5.5KW, 440V, 60HZ)
Rewinding of stator coil, as well as cleaning,
inspection, baking, insulation varnish coat
and
running test. |
Incheon |
| 6 |
36,803 GT
BULK CARRIER |
CHINA |
Annual services for safety equipments.
1.Life rafts.
2.Fire extinguishers
3.Fixed CO2 system(including supply of new
cylinders
with maker's certificate)
4.Breathing apparatus.
5.EEBD |
Donghae |
| 7 |
29,381 GT
GENERAL
CARGO |
HONG- KONG |
Reconditioning of anchor bolts.
Dia 67.5/85mm with thread 883mmL. |
Ulsan |
|
| |
Major Performance Record
For
The 1st quarter of 2011
| NR |
VESSEL |
COUNTRY |
WORK SCOPES |
PORT |
| 1 |
32,210GT
BULK CARRIER |
U. K. |
Temporary repair for followings in the presence
of BV surveyor at an anchorage, round the
clock, with barge/tug, cranes and working
boat, after advanced inspection on board.
1.Shell plate iwo Nr. 1 hold.
1)Erection/removal of stages (90mtrs).
2)Doubling with mild steel grade A. (7 pcs / 1.7tons).
3)Installation of reinforcement angles.
(124mtrs / 7.44 tons).
2.Shell plate iwo Nr. 5 hold.
1)Erection/removal of stages (24mtrs).
2)Installation of reinforcement angles.
(46mtrs / 2.76 tons).
|
Incheon |
| 2 |
36,803GT
BULK
CARRIER |
CHINA |
Supply of manual hyd' jacks
(280/445mm, 30tons) |
Samchonpo |
| 3 |
14,708GT
GENERAL
CARGO |
Rectification of followings.
1.RADAR(JRC, JMA 9932 SA)
2.Gyro compass(Tokyo Keiki, PR-4000-E/
TG-5000) with replacement of STEP
AMP PWB (10229269-7 x 1 set) |
Masan |
| 4 |
15,375GT
CONTAINER CARRIER |
GERMANY |
Supply of valves
1.Seawater non return valve
2.Steam valve |
Busan |
| 5 |
41,181GT
PRODUCTS TANKER |
U. K. |
Fabrication/delivery of 2 pcs of piston rod
for jack cylinder of hatch cover
(Macgregor Far East), with nickel & chrome
plating. |
Kunsan |
| 6 |
8,665GT
REFRIGERATED CARGO |
POLAND |
Annual service for a gyro compass
(ANSCHUTZ STD 14), including renewal of
gasket and supporting liquid. |
Busan |
| 7 |
15,884GT
BULK CARRIER |
VIETNAM |
Inspection for following alarm system.
1.Bilge alarm(FOCAS-1500A)
2.Auto alarm control panel in ECR.
3.L.O. low level alarm for M/E & G/E |
Busan |
|
|
|